40 Yard Dumpster · Littleton, CO
40 Yard Dumpster Rental in Littleton, CO
Our largest container, built for commercial jobs, demolition and major builds across the south Denver metro.
- Same-day & next-day delivery
- Flat-rate, all-in pricing
- Driveway protection included

- Same-Day DeliveryCall before noon and we can usually be there today.
- Flat-Rate PricingDelivery, pickup, disposal and tax quoted up front.
- Licensed & InsuredFully licensed and insured for dumpster service across Colorado.
- Locally BasedBased right here in Littleton, serving the south Denver metro.
At a glance
40 Yard Dumpster specifications
- Dimensions22 ft x 7.5 ft x 8 ft
- Capacity12-16 pickup loads
- Weight included5-6 tons
- Rental period7 days standard, extend any time
- DeliverySame-day or next-day across the south Denver metro
- PricingOne flat rate — delivery, pickup, disposal & tax
The 40 yard is our largest container, built for the jobs that genuinely need it — a major commercial cleanout, a demolition project, or a large new-construction site generating multiple truckloads of bulky, light debris.
Right job, right box
What this size is built for
Ideal projects
- Major commercial cleanout
- Full demolition project
- Large new-construction site
- Major whole-property renovation
- Large-scale estate or property clearance
Pick a different size if…
- Small residential jobs
- Dedicated heavy/dense material loads
- Tight-access lots
Not sure? Call (983) 226-0841 and describe what you are looking at. We would rather sell you a smaller container than have you pay for space you do not use.
Capacity in real terms
How much actually fits
| What you're loading | How it fits in a 40 yard dumpster |
|---|---|
| A full commercial building cleanout | A comfortable, typical fit |
| Multi-phase construction site debris | Fills by volume across a build phase |
| A large property's full renovation debris | A comfortable, typical fit |
| 12-16 pickup truck loads | The standard comparison |
Commercial and demolition-scale jobs
A major commercial cleanout, a full building demolition, or a large multi-phase construction project typically calls for a 40 yard's capacity — enough room to avoid multiple container swaps for bulky, low-density debris.
Access requirements are the real constraint
A 40 yard needs the same roughly 60 feet of straight approach and 23 feet of vertical clearance as a 30 yard, but takes up more ground footprint once placed. It fits well on open commercial lots and larger residential properties, less well on a tight in-town Littleton block.
When a 40 yard is more than you need
If your job is weight-limited rather than volume-limited — concrete, tile, dense debris — a 40 yard is almost always the wrong choice, since you'll hit the weight allowance long before filling it. Call and describe the material mix and we'll steer you to the right size.
Side by side
Compare with the other sizes
| Size | Dimensions (L x W x H) | Holds About | Weight Allowance | Best For |
|---|---|---|---|---|
| 10 Yard Dumpster | 14 ft x 7.5 ft x 3.5 ft | 3-4 pickup loads | 1-2 tons | Small cleanouts, single rooms, roofing, concrete |
| 15 Yard Dumpster | 16 ft x 7.5 ft x 4.5 ft | 5-6 pickup loads | 2-3 tons | Garage clearouts, small remodels, yard-waste debris |
| 20 Yard Dumpster | 22 ft x 7.5 ft x 4.5 ft | 6-8 pickup loads | 3-4 tons | Whole-home cleanouts, roof tear-offs, remodels |
| 30 Yard Dumpster | 22 ft x 7.5 ft x 6 ft | 9-12 pickup loads | 4-5 tons | Large remodels, construction, estate clearances |
| 40 Yard Dumpster | 22 ft x 7.5 ft x 8 ft | 12-16 pickup loads | 5-6 tons | Commercial jobs, demolition, big builds |
Book a 40 yard dumpster in Littleton
Call (983) 226-0841 for a flat rate and a delivery slot — often the same day.
Answers
40 Yard Dumpster — frequently asked questions
When do I actually need a 40 yard?
For genuinely large jobs — a commercial cleanout, a demolition project, or a large new-construction site. For most residential jobs, a 20 or 30 yard is the better fit.
How much driveway or lot space does a 40 yard need?
Similar approach length to a 30 yard, roughly 60 feet, but a larger ground footprint once placed — open commercial lots and larger properties fit it best.
Is a 40 yard good for heavy material like concrete?
No — heavy, dense material hits the weight allowance long before filling a 40 yard. Use a dedicated 10 or 15 yard for concrete, brick or fill dirt instead.
Can a 40 yard fit on a residential driveway?
Sometimes, on a larger property with a wide, open approach. Many tighter in-town Littleton lots won't have the clearance — describe your site and we'll confirm.
Compare
Other container sizes
Verified sources
Local & Official Resources
Rules, fees and hours are set by these agencies, not by us, and they change. Always go straight to the source:
- City of Littleton, CO -- permits, right-of-way and city services
- Arapahoe County, CO Government -- Arapahoe County commission and permitting
- Colorado 811 - Call Before You Dig (call 811) -- call 811 before any digging or footing work
- Colorado Department of Transportation (CDOT) -- CDOT road and right-of-way information